Word格式/直接打印/内容可修改




| Donald Jobs | 
| No.67, Lane123, Job Road, Job District, Shanghai, China, 200070 | 
| service@55.la | (+86) 0592-5885308 | 
| SKILLS | 
|  | Water Quality Monitoring:  | 
|  | • | Manual and automatic flow monitoring, water quality monitoring using ConductivityTemperatureDepth (CTD) instrument; sample collection QAQC procedures | 
|  | Environmental Legislation: | 
|  | • | Local and federal environmental regulations including King County Sensitive Areas Ordinance and NPDES permitting procedures | 
|  | Computer Experience: | 
|  | • | SPSS programming, MODFLOW groundwater flow and solute transport model and other modeling applications; MS Office | 
|  | Computer Experience: | Project proposals, technical reports, and specifications | 
|  | French Fluency: | Lyon, France, completed civil engineering classes in French, 9/2012-6/2013 | 
| REPRESENTATIVE PROJECTS | 
|  | Urban Stormwater Runoff Monitoring and Policy Analysis, Research and Thesis Focus | 
|  | City of Bellevue and the University of Washington-Seattle |  Winter-Spring 2013 | 
|  | • | Water quality oversight for the Lakemont Boulevard construction project in Bellevue | 
|  | • | Extensive analysis of water quality regulations and permit requirements; development of a stormwater monitoring plan and compilation and analysis of baseline data | 
|  | 
|  | Water Quality Monitoring, Sitcum Waterway Remediation Project | 
|  | Commencement Bay, Tacoma, WA | Spring 2012 | 
|  | • | Performed water quality monitoring, interpreted specifications, completed daily reports recording any exceedances, coordinated with the EPA and the Port of Tacoma and analyzed acquired data | 
|  | 
|  | Bridge Inspection and Design, USDA Forest Service | Spring 2011 | 
|  | • | Inspected bridges, assisted with the design of a concrete bridge and inspected Contractor’s work on construction of concrete bridge in Packwood, WA | 
|  | 
|  | Drainage Studies; Moffatt, Nichol and Bonney, Inc.; Portland OR | Spring-Summer 2011 | 
|  | • | Assisted design team with taxiway improvements at Portland Airport. Conducted drainage studies | 
| EXPERIENCE | 
|  | Research Assistant | City of Bellevue Dept. of Transportation | October 2011-present | 
|  | Environmental Engineer | Sanders and Associates, Inc. | June 2011-October 2011 | 
|  | Civil Engineering Technician | National Forest Service | Summer 2012 | 
|  | Civil Engineering Intern | Moffatt, Nichol and Bonney Consultants, Inc. | Summer 2011 | 
| HONORS AND AWARDS | 
|  | Henry L. Gray Fellowship | University of Washington |  2012-2013 | 
|  | Society of Women Engineers Scholar | Washington University |  2011-2012 | 
|  | Dean of Engineering Honorary Scholar | Washington University |  2010-2012 | 
| AFFILIATIONS | 
|  | American Academy of Environmental Engineers | 
|  | American Society of Professional Wetland Engineers | 
邮箱
电话